Production Capability

    With the tireless efforts of all staff members, AEC has accumulated a solid fiancial foundation as well as a galaxy of talents, and constantly optimized its own industrial chain. A comprehensive databank has been set up to store and track the information of partners from raw material suppliers to equipment suppliers to end customers. Through the internal and external audits every year, we have kept bridging gaps in our development and perfecting ourselves. On-job trainings for members of management, R&D and workshop laborers guarantee the daily work with high accuracy and efficiency. With the introduction of sophisticated automatic equipment and management mode of mass production after the plant expansion, AEC has the confidence to provide quality batteries in a comparatively short lead time for our customers.


◆Equipment:

Workshop area for the polymer Li-ion battery pack manufacture is 20,000 m2;

Production capacity of the polymer Li-ion battery pack: 250K pcs/day (1Ah standard);

Possessing 4 sets of automatic coating lines, 8 sets of automatic slitting and winding machines, more than 40 sets of semi-automatic slitting and winding machines, 3 sets of automatic electrolyte injecting systems and capacity grading systems with over 100K testing points.

◆Production line:

There are 12 pack assembly lines; 

Cleanliness factor of the dust-free workshop has been kept at the 105 level and all rooms are equipped with temperature and humidity control systems;

The unique tracing system has been adopted to ensure the purchased materials and producing processes are traceable.     

◆Employees:

 There are about 1200 employees working in the production lines.

automatic production line:











甘肃11选5走势 吉林十一选五官网 湖北十一选五走势图 下载炒股软件手机版 意大利pk10是官方开奖吗 甘肃11选五走势图定牛 排列3开奖结果排列5 安徽十一选五人工计划 广西11选5直三中多少 吉林省快三走势图今天 吉林十一选五走势 快乐8怎么玩选几个号 四川快乐12手机版 广西快乐十分精确杀号 幸运农场号码走势 彩票双色球 安微11选5最新开奖